national portal for rooftop solar

National Portal for Rooftop Solar: A Step-by-Step Guide for Applying in India (2025)

April 17, 2024

The Government of India’s National Portal for Rooftop Solar aims to simplify the process of installing solar panels on your home or business. This guide walks you through every step, from registering on the portal to commissioning your system and enjoying the benefits of clean energy.

national portal for rooftop solar

Prerequisites:

  • A stable internet connection
  • Details of your electricity distribution company (DISCOM)
  • Consumer number associated with your electricity bill
  • Mobile phone number for OTP verification
  • Roof ownership documents (if applicable)

Steps to Apply on the National Portal for Rooftop Solar

  1. Registration:
    • Visit the official Rooftop Solar Scheme portal: https://urbansolar.com/residential-solar-panel-installation/
    • Click on “New User Registration” and provide the required information.
    • You’ll receive a One-Time Password (OTP) on your registered mobile number. Enter the OTP to verify your registration.
  2. Login and Project Details:
    • Log in using your registered credentials.
    • Click on “Apply for Rooftop Solar.”
    • The portal will guide you through entering your project details, including:
      • Consumer Category: Select “Residential” or “Commercial” based on your property type.
      • DISCOM: Choose your electricity distribution company from the dropdown menu.
      • Consumer Details: Enter your consumer number and other details as mentioned in your electricity bill.
      • Sanctioned Load: This information can be found on your electricity bill.
      • Proposed Rooftop Solar Capacity: Carefully consider your electricity needs and choose a capacity that meets your hot water or power requirements.
  3. Rooftop Details:
    • Provide details about your rooftop, including:
      • Roof Area: Measure the usable area of your rooftop suitable for solar panel installation.
      • Roof Type: Select the type of roof (flat, sloped, etc.) from the options provided.
      • Shading Impact: Indicate if there are any obstructions like trees or buildings that might cast shadows on your rooftop.
  4. Selection of Channel Partner:
    • The portal allows you to choose a channel partner (solar power installer) from a pre-approved list.
    • You can filter the list based on your location or request customized quotes from multiple vendors.
  5. System Specifications and Sanction Letter:
    • After selecting a channel partner, the portal will display the proposed system specifications, including the number of solar panels, inverter capacity, and estimated electricity generation.
    • Review these details carefully and confirm your project details.
    • The DISCOM will then assess your application and issue a sanction letter if approved.
  6. Installation and Net Metering:
    • The chosen channel partner will handle the installation process, following safety regulations and best practices.
    • Net metering allows you to earn credits for excess electricity generated by your solar system and fed back to the grid.
    • Your DISCOM will install a net meter to track energy consumption and generation.
  7. System Commissioning and Monitoring:
    • Once the installation is complete and inspected by the DISCOM, your solar rooftop system will be commissioned, and you can start using clean solar energy.
    • The National Portal offers a user dashboard to monitor your system’s performance, track energy generation, and manage your net metering credits.
national portal for rooftop solar

Additional Tips:

  • Rooftop Assessment: Consider getting a professional rooftop assessment to determine its suitability for solar panel installation and identify any potential challenges.
  • Financial Incentives: Explore government subsidies and loan options available for rooftop solar installations in your state.
  • Maintenance: Regularly clean your solar panels to optimize their efficiency and ensure a long lifespan for your system.

FAQs: National Portal for Rooftop Solar

Q. What types of buildings are eligible for rooftop solar through the portal?

A. Residential, commercial, government, non-profit, and educational institutions can all apply. There may be specific exclusions, so check the portal’s detailed eligibility criteria.

Q. Is there a minimum or maximum capacity for the solar system I can install?

A. The portal has no set minimum, but your electricity provider may have its own limitations. Maximum capacity limits are generally based on your current sanctioned load (from your electricity bill).

Q. How long does the entire process take, from application to commissioning?

A. Timelines can vary depending on DISCOMs and vendor workload. Ideally, the process should be completed within 30-60 days. Factors like complex roof design or monsoon season could cause delays.

Q: Are there any upfront costs or fees associated with applying through the portal?

A: Application on the portal itself is generally free. However, you’ll need to pay your chosen installation company for the system and installation costs.

Q. What if I’m not satisfied with the work of the channel partner I selected?

A. The portal should have a grievance redressal mechanism. Contact the portal’s support team for guidance. Document any issues thoroughly to strengthen your case.

Q. Can I get financing for my rooftop solar project?

A. Many banks offer loans specifically for rooftop solar installations. Check the portal and your local banks for their financing schemes and eligibility requirements.

Q. What happens if my solar system generates more electricity than I use?

A. Net metering allows you to earn credits for the excess energy you send back to the grid. These credits offset your future electricity bills.

Q. Do I need any approvals beyond DISCOM approval?

A. It depends. If you live in a housing society or apartment complex, they may have additional rules or approvals needed before installation.

Suhas is the founder and chief editor of vecharged.com, a leading US-based publication focused on the future of energy and mobility. With a deep passion for the technology that is shaping our world, his work focuses on providing clear-eyed analysis and rigorous, hands-on reviews of the latest electric vehicles, home solar systems, and portable power solutions. He founded vecharged to cut through the industry jargon and provide consumers with the data-driven, unbiased information necessary to navigate the clean energy transition with confidence. His insights have helped thousands of readers make smarter, more informed decisions about their energy use.

The Best Portable Power Stations of 2025: EcoFlow vs. Jackery vs. Bluetti vs. Anker

The Best Portable Power Stations of 2025: EcoFlow vs. Jackery vs. Bluetti vs. Anker

September 19, 2025

In the world of portable power, four titans dominate the landscape: EcoFlow, Jackery, Bluetti, and Anker. Each brand commands a loyal following, but choosing between them can be overwhelming. Are you looking for the fastest charging, the longest-lasting battery, the most power, or the best overall value? Forget sorting through dozens of spec sheets and

The Ultimate Guide to Flying with Lithium Batteries (And Not Getting Them Confiscated)

The Ultimate Guide to Flying with Lithium Batteries (And Not Getting Them Confiscated)

September 15, 2025

You’re standing in the airport security line. You’ve got your laptop, your phone, a big new power bank for your trip, maybe even some drone batteries. And a nagging, expensive thought hits you: “Am I allowed to fly with this?” You have a vague memory of some rule, a story from a friend who had a

The Sodium-Ion Revolution: A Brutally Honest Economic Analysis

The Sodium-Ion Revolution: A Brutally Honest Economic Analysis

September 15, 2025

You’ve seen the headlines about the new ‘salt’ battery. Tech sites are buzzing, calling it a potential “lithium killer.” They’ll tell you about its chemistry, its performance in the cold, and the first few products to use it. This is not one of those articles. They are missing the real story. As an engineer, I

Game Over: BMW’s 800V Platform Just Made 400V Luxury EVs Obsolete

Game Over: BMW’s 800V Platform Just Made 400V Luxury EVs Obsolete

September 6, 2025

The Bottom Line The 2026 BMW iX3, the first vehicle on the Neue Klasse platform, is a strategic pivot, not an incremental update. Its 800-volt architecture enables a charging speed (400kW) and system efficiency that renders most current 400-volt luxury EVs technically obsolete. This platform isn’t a feature; it’s a new engineering benchmark that forces

Next
Share to...